Formwork in Construction



A Formwork system signifies the molds use to store and hold wet concrete until curing is achieved. Good concrete cannot be made from a poor mould; thus formwork is very important in producing good concrete. Besides that, it has to be designed to take the concrete load and the working load generated from workers and plant.

Formworks are molds where concrete in its plastic form is poured so that it can be molded into the desired shape, size, position, and more importantly, its alignment, when it become solid concrete. Materials used for formwork construction range from timber, steel, and aluminum to glass–reinforced plastics.

IMPORTANT FACTORS TO BE CONSIDERED FOR THE INSTALLATION OF FORMWORK

The following factors is consider when doing form work; Timber and plywood are generally used Materials on site for Cast in-situ concrete work. Columns, Beams, slabs, lift walls, and staircases are all constructed using Timber and plywood formwork. Steel casing formwork is use for few structures such as round columns.

  • Correct position
  • Line and level
  • Accuracy within permitted tolerances
  • Shape of members
  • Verticality (plumb)
  • Correct angles for batters etc.
  • Finishing heights (mark off)
  • Formwork joints flush and tight
  • No nails protruding into the concrete
  • Formwork joints sealed as required
  • Construction joints strutted and supported

 

TYPES OF FORMWORK
[1] WOOD FORMWORK

Formwork made out of wood is widely used in construction. The wood formwork system is a combination of lumber and plywood. Plywood is also known as “sheathing” in the formwork system and is used as a supporting layer of formwork in direct contact with the concrete. It is made from thin sheets of wood, called veneer, glued together under intense heat and pressure. Wood formwork has a limited number of reuses compared to other materials of formwork.

[2] STEEL AND ALUMINUM

Steel and aluminum formwork is used mainly due to its capability to carry heavy concrete, provide longer spans, and having good potential for reuse. They are often more favorable over wood formwork because it is a lot easier and faster stripping a steel or aluminum formwork than wood formwork from concrete. The main differences between steel and aluminum formwork are their weight and cost. Steel formwork costs more and is heavier than aluminum formwork.

[3] GLASS REINFORCED PLASTIC FORMWORK

Glass-reinforced plastic made for formwork is a fiber reinforced polymer (FRP). It is a material of high strength and still lightweight. Glass-reinforced plastic formwork is useful for structural concrete elements that have complex shapes and unique features. It is easy to disassemble and has a capability for a high number of reuses.

 

HOW REUSABILITY AND CARE OF FORMWORK SAVE CONSTRUCTION COST

The reusability of formwork depends on the nature of the construction. The more symmetrical and repetitive the structural element layout is, the more favorable formwork reuse is. Complicated structural elements such as curved concrete beams or any irregularly shaped concrete structure may require custom made formwork, which does not favor formwork reuse.

Formwork materials must be handled carefully and accidental dropping must be avoided as possible. Used formwork panels should be inspected for damage before they are used again. Formwork highly affects the final appearance of the finished structure, so any defect must be checked first and repaired or removed; otherwise the formwork defect will reflect on the finished surface of the concrete. After the formwork is repaired, any excessive concrete on the formwork surface must be removed also. Aluminum formwork should be oiled to prevent it from getting rusty. After the used formwork is repaired, excessive concrete removed and oiled, they should be stockpiled and covered with suitable fabric like canvas.

Formwork is a large proportion of the total cost of a building structure, approximately 10 percent of total cost of the structure. Reusing formwork for concrete is one of the ways to reduce construction costs. The initial cost of formwork materials will drop to 40 percent after five reuses. The economical value or reusing formwork lies in the ease with which it can be stripped from concrete. With that in mind, formwork designers must kept abreast in advancing technology of formwork manufacturing so that quality can be maintained without ignoring its economical value in facing new challenges in reusing concrete formwork.

 

STRIKING OF FORMWORK OR DE-SHUTTERING TIME FOR DIFFERENT STRUCTURE MEMBER

 

Columns, Walls (vertical formworks) 16-24 hours
Soffit formwork to slabs 3 days (props to be refixed after removal)
Soffit to beams props 7 days (props to refixed after removal)
Beams spanning upto 4.5m 7 days
Beams spanning over 4.5m 14 days
Arches spanning up to 6m 14 days
Arches spanning over 6m 21 days

 

 

Love this post and you love to get a copy

Click on the button below to Get the PDF file and Read Offline.

CHECK OUT  Compass Surveying and How to use a Compass
Tags:

Enter your Comment....

This site uses Akismet to reduce spam. Learn how your comment data is processed.